One Of MBBR Case From Juntai:A Municipal Wastewater In Anhui

Leave a message

By: Sunny Wu(sunny7@juntaiplastic.com)

Post Date: May 13st 2021

Post Tags: MBBR case


Write at the beginning:MBBR Application field

22

Municipal wastewater biological treatment  22Aquaculture wastewater treatment


image     image


22Industrial wastewater biological                   22New construction and remould upgrade


image      image


Enter the topic,case:A Municipal Wastewater In Anhui


imageCustomer Requirement: First they design processing capacity 55000ton per day, the process is traditional activaed sludge process, the emission standard is second level. Now they require upgrade to primary A standard. 


Solution: Use JUNTAI MBBR process reconstruction scheme as follow: 

 ① Not need to build new aerobic process basin, put the JUNTAI MBBR to originalaerobic process basin; Remould the aerating system, set up the intercept device when effluent. 

② Build new anaerobic basin and anoxic basin


Result: MBBR process can reach good treatment effect for ammonia nitrogen and total nitrogen removal.the effluent water quality index can reach up to primary A stanrdad.