May 24, 2021

JUNTAI MBBR Case One

Leave a message

A Municipal Wastewater In Anhui

Whatsapp/M:+86 152 6746 2807

Email: Kate@aquasust.com

 

image

 

Customer Requirement:

First, the design processing capacity of 55000ton per day, the process is a traditional activated sludge process, the emission standard is the second level. Now they require an upgrade to primary A standard.

Solution:

Use JUNTAI MBBR process reconstruction scheme as follow:

Not need to build a new aerobic process basin put the JUNTAI MBBR to original aerobic process basin; Remould the aerating system, set up the intercept device when effluent. 

Build new anaerobic basin and anoxic basin

Result:

image

MBBR process can reach a good treatment effect for ammonia nitrogen and total nitrogen removal. the effluent water quality index can reach up to primary A standard.

 

image

 

news-398-396MBBR06

Size:Φ16*10mm  Hole Numbers:06

Material: 100% White Virgin HDPE  Weight:120KG/CBM

Densilty:0.96-0.98g/cm3

Surface Area:>800m2/m3

news-399-399

MBBR19

Size:Φ25*12mm  Hole Numbers:19

Material: 100% White Virgin HDPE  Weight:95KG/CBM

Densilty:0.96-0.98g/cm3

Surface Area:>650m2/m3

news-399-400

MBBR37

Size:Φ25*12mm,  Hole Numbers:37

Material: 100% White Virgin HDPE  Weight:105Kg/CBM

Densilty:0.96-0.98g/cm3

Surface Area:>800m2/m3

 

 

Send Inquiry