Common problems of AquaSust MBBR process in engineering application:
How long does it take for the filler film to hang during low-temperature debugging in winter?
In one month, it can achieve the standard well. If the film is hanging, it is actually a process.
We divide the film into two angles.
-The first is that our naked eyes can see the obvious biofilm on the filler. This time will take seven days; --The second is that the standard is up to the standard. Time, this time is probably within one month in winter;
-The third is the time when the biofilm is fully mature, this will be longer, because from a professional point of view, the full maturity of biofilm requires at least one winter and summer alternation.
-The colony on it can finally achieve stability.
*To sum up, although from an academic point of view, our stability is probably after a winter and summer. From the point of view of our effect, the water can reach the standard within 30 days, and from the point of view of naked eyes, it is about seven days.




Hot Tags: mbbr bio media filter media for treatment, China, suppliers, manufacturers, factory, cheap, in stock, free sample


















